免费空白俄亥俄州建筑工程分包协议 (2026)
下载俄亥俄州的空白建筑工程分包协议模板:与我们的生成器相同的、考虑法规的排版,留有空白行供手写填写。无需账户、无需邮箱、无水印。
无法生成文件。请重试或在线填写。 改为在线填写(免费预览)
改为在线填写(免费预览)
开始回答几个问题——我们会应用俄亥俄州的规则,检查您的输入,并生成干净的 PDF 和 Word 文件。
本文件遵循的俄亥俄州规则
| 向分包商及时付款 | The contractor must pay the subcontractor within 10 days after the contractor receives payment from the owner. Late payment carries 18% per year.来源: Ohio Rev. Code § 4113.61 |
|---|---|
| 私人工程保留金上限 | No statutory cap was confirmed — retainage is whatever the subcontract says, and should never exceed what the owner holds from the general contractor |
| “收到才付”条款 | Ohio enforces a pay-if-paid clause when the contract uses express condition-precedent language.来源: Transtar Elec., Inc. v. A.E.M. Elec. Servs. Corp., 140 Ohio St. 3d 193, 16 N.E.3d 645 (2014) |
| 反赔偿法 | An indemnity clause in a construction contract is void to the extent it makes the subcontractor answer for the indemnitee's sole negligence; indemnity for shared fault is still allowed.来源: Ohio Rev. Code § 2305.31 |
| 分包商留置权 | An unpaid subcontractor may record a mechanics lien against the project; the chapter below sets the preliminary-notice and filing deadlines, which run from the subcontractor's last work, not from the general contractor's.来源: Ohio Rev. Code §§ 1311.01 et seq. (mechanics' liens) |
常见问题
空白模板免费吗?
是的。空白建筑工程分包协议可免费下载为 PDF 或 Word——无需账户、无水印。付费版本是我们的生成器根据您的答案生成的完整文件。
在俄亥俄州有效吗?
该模板遵循本页列出的俄亥俄州规则(审核于 2026年9月)。空白表格只有在正确填写并由各方签署后才成为有约束力的文件。请查看下方的州规则,特殊情况请考虑咨询律师。
应该手写填写还是在线填写?
在线填写更安全:生成器会应用俄亥俄州的限额和通知期,验证您的输入,并生成干净的 PDF 和 Word 文件。手写填写适用于简单情况——请书写清楚,每页签姓名缩写,并为各方保留一份签署副本。