How to Fill Out Form WH-347 (2026): Certified Payroll Line by Line

Form WH-347 is the one-page weekly payroll that proves you paid Davis-Bacon prevailing wages. It is not hard, but it is unforgiving: a missing signature, a classification that does not match the wage determination, or fringe shown but not paid will get the payroll returned and can hold up your draw. This guide walks the header, the nine columns and page 2 in the order you fill them in.

Reviewed September 2026Davis-Bacon and Related Acts · Copeland Act

1. The rules behind the form

TermRuleSource
FormWH-347, Rev. January 2025 — OMB No. 1235-0008 (expires 01/31/2028)Form WH-347 (Rev. Jan. 2025)
Who filesEvery contractor and subcontractor on a covered contract, weekly29 C.F.R. § 5.5(a)(3)(ii)
Coverage thresholdFederal or federally assisted construction contracts over $2,00040 U.S.C. § 3142(a)
Small-contract exceptionNo weekly statement on contracts of $2,000 or less29 C.F.R. § 3.3(c)
Statement of CompliancePage 2 (or identical wording), signed each week29 C.F.R. § 3.3(b)
Identifying numberLast four digits of the SSN; no full SSN or home address on the submitted copy29 C.F.R. § 5.5(a)(3)(ii)(A); Form WH-347 instructions, column 1E
Overtime1.5 × basic rate after 40 hours in the workweek40 U.S.C. § 3702(a) (Contract Work Hours and Safety Standards Act)
Record retention3 years after completion of the prime contract29 C.F.R. § 5.5(a)(3)(i)
False statementsCriminal and civil liability; debarment18 U.S.C. § 1001; 31 U.S.C. § 3729

2. Before you start

Have four things open: the wage determination attached to the contract (it fixes the classifications, basic rates and fringe amounts), the week's time cards split by project, the payroll register with each worker's gross and deductions, and last week's payroll so the numbering continues. Decide once how you pay fringe — cash on the paycheck, into a bona fide plan, or a mix — because columns 6 and page 2 item 4 must say the same thing every week.

3. Page 1, column by column

FieldWhat goes in it
HeaderContractor or subcontractor name and address. Tick Contractor or Subcontractor — a sub lists its own name, not the prime's. Payroll No. runs consecutively from 1 for the first week on the project; For week ending is the last day of your workweek; Project and location and Project or contract No. come from the contract documents.
Column 1Name and an individual identifying number — the last four digits of the Social Security number, never the full SSN and never the home address on the copy you submit. Keep the full details in your own records.
Column 2Number of withholding exemptions. Optional; most agencies ignore it. Leave blank or fill from the W-4.
Column 3Work classification exactly as it appears in the wage determination for the contract (for example Electrician, Laborer — Group 1). A worker who did two kinds of work gets two lines, one per classification, with the hours split. Apprentices are shown as Apprentice — Electrician (1st period, 50%) and must be registered in an approved program.
Column 4Hours worked each day. The two rows per worker are O (overtime) and S (straight time). Write the day of the week and date in the box above each column. Enter only hours worked on this project.
Column 5Total hours for the week, straight time and overtime on their own rows.
Column 6Rate of pay. On the S row, the basic hourly rate plus — if you pay fringe in cash — the fringe amount, written as $32.10/$8.40. On the O row, one and one-half times the basic rate plus the fringe at straight rate (fringe is not multiplied). Overtime starts after 40 hours in the workweek on covered contracts.
Column 7Gross amount earned. If the worker also worked on other jobs that week, write the project amount over the total for all work, as $1,284.00 / $1,910.00, so the deductions in column 8 (which are taken from the whole paycheck) reconcile.
Column 8Deductions: FICA, federal withholding, state tax, and Other. Anything under Other — union dues, garnishments, 401(k) — must be explained in the space below the table or on page 2, item 2, and must be a deduction permitted by the Copeland regulations. Total deductions in the last sub-column.
Column 9Net wages paid for the week — column 7 (all work) minus column 8 total. This is the amount on the paycheck.

Worked example. An electrician on a wage determination of $32.10 base + $8.40 fringe, paid fringe in cash, works 44 hours on the project and nothing else. S row: 40 hours × $40.50 = $1,620.00. O row: 4 hours × ($48.15 + $8.40 = $56.55) = $226.20. Column 7: $1,846.20. If his FICA, federal and state withholding total $412.30, column 9 is $1,433.90. The same worker paid fringe into a union plan shows $32.10 on the S row and $48.15 on the O row, with the plan named on page 2 item 4(a).

4. Page 2 — the Statement of Compliance

This is what makes the payroll certified. The signer — the contractor, the subcontractor, or the officer or employee who supervises payment of wages — certifies under penalty of law that the payroll is complete and correct, that every worker was paid the full weekly wage without rebate, that no deductions were taken other than those permitted by the Copeland regulations (item 2 lists any Other deductions), that classifications and rates match the wage determination, and that apprentices are registered. Then tick 4(a) if fringe benefits were paid to approved plans, funds or programs, 4(b) if paid in cash, and use 4(c) to explain any exceptions (for example one trade paid partly in cash). Date and sign — an original or compliant electronic signature every week; a stamp or photocopied signature is not accepted.

5. Special weeks

  • No work this week: submit a payroll anyway, marked No work performed, numbered in sequence and signed, or tell the agency in writing that you will file only for weeks worked.
  • Correcting a prior week: file a revised payroll with the same number marked Revised, showing the corrected figures and any restitution paid.
  • Last week on the job: mark the payroll Final.
  • Owner-operators and sole proprietors: list yourself if you performed covered work; rate and hours are reported, deductions may be none.

6. What gets payrolls rejected

  • Fringe shown but not paid. If column 6 includes a fringe amount, it must be paid in cash to the worker or into a bona fide plan — and page 2 item 4 must say which. Writing the wage-determination fringe in column 6 while paying only the base rate is the most common underpayment finding.
  • Wrong classification. Using a lower-paid classification than the work performed (a 'laborer' running a backhoe) is a prevailing-wage violation even when the hours and math are perfect. Match column 3 to the wage determination and to what the worker actually did.
  • Gaps in the numbering. Payroll numbers must be consecutive. A week with no work still gets a payroll — write No work performed across the sheet, sign page 2, and keep the sequence — or the reviewing agency will assume a missing week.
  • Unsigned or photocopied Statement of Compliance. Page 2 needs an original signature (wet or electronic) by the contractor, the subcontractor, or the officer who supervises payment of wages each week. A payroll without it is not 'certified' and is routinely returned.
  • Full SSNs or home addresses on the submitted copy. Since 2008 the copy sent to the agency carries only an identifying number (last four digits of the SSN). Full data stays in your records for the three-year retention period.
  • Overtime at the base rate only. Hours over 40 in the workweek are paid at 1.5 × the basic hourly rate; the cash fringe is added at straight rate on top. Forgetting the premium on the O row triggers back wages plus liquidated damages under CWHSSA.
  • 'Other' deductions with no explanation. Every amount in the Other column must be identified and must be one the Copeland regulations allow (court orders, union dues under a CBA, voluntary contributions the worker authorized in writing). Tool, uniform or damage charge-backs are not.
  • Not marking the last one. Write Final on the last payroll for the project so the agency closes its file; otherwise it keeps expecting weekly submissions.

7. State-funded projects

Davis-Bacon covers federal money. State and local public works are governed by each state's own prevailing-wage law, which may require a different form (California's DIR eCPR, New Jersey's MW-562, Washington's L&I intent and affidavit system), a different filing frequency and a different recipient. Our certified payroll requirements by state table lists all 51 jurisdictions with the statute for each.

Generate the payroll

Our WH-347 certified payroll generator lays out the form exactly as the Wage and Hour Division publishes it: enter each worker once, split hours by day, and it computes the overtime rate, fringe, gross-over-total and net, numbers the payroll, and produces page 2 with the compliance boxes filled from your fringe choice. Pick your state to add the state-specific form where one is required. A watermarked preview is free; the clean PDF and Word file are $24.

Related: lien waiver laws by state · change order requirements by state · subcontractor agreement · pay stub generator.

Questions

Is Form WH-347 mandatory?

No. The form itself is optional, but the weekly submission of the same information plus a signed Statement of Compliance with identical wording is mandatory on every Davis-Bacon covered contract (29 C.F.R. § 5.5(a)(3)(ii)). Most agencies and prime contractors simply require WH-347 or an electronic equivalent such as LCPtracker or eMars.

Which contracts need certified payroll?

Federal and federally assisted construction contracts over $2,000 (40 U.S.C. § 3142). The weekly statement is waived only for contracts of $2,000 or less. Many states have their own 'little Davis-Bacon' law with a separate form and threshold for state-funded work — see the state table linked below.

When is the payroll due?

Weekly, within seven days after the regular pay date for the pay period (29 C.F.R. § 5.5(a)(3)(ii)(A)). A subcontractor submits to the prime contractor, who forwards all payrolls to the contracting agency.

Do I show hours worked on other jobs?

Only project hours go in columns 4–5. Column 7 shows gross for this project over gross for all work, so that column 8 deductions — taken from the whole paycheck — add up.

How do I report a salaried foreman?

A working foreman who spends more than 20% of the week doing laborer or mechanic work is covered for those hours; list the covered hours and classification and pay at least the prevailing rate for them. A purely supervisory foreman is not listed.

How long do I keep the payrolls?

Three years after all work on the prime contract is completed (29 C.F.R. § 5.5(a)(3)(i)), including the basic records behind them — time cards, fringe plan documents, apprenticeship registrations.

What happens if the payroll is wrong?

Honest errors are corrected with a revised payroll for the week. Willful falsification is a federal crime under 18 U.S.C. § 1001, a False Claims Act liability under 31 U.S.C. § 3729, and grounds for debarment from federal contracts for up to three years.

How current is this guide?

Reviewed September 2026. The rules and citations come from the dataset behind our WH-347 generator; the walk-through is ours. Check the current form and instructions at dol.gov before relying on it.

General information about federal certified payroll requirements, not legal advice; FormsByState is not a law firm. Wage determinations and agency practice vary by contract — confirm with the contracting officer.

Related state law tables